ItemDescription
QtyUnit
Amount
A.1
Excavate to reduce levels
1,240m³
128,400.00
B.4
Reinforced concrete, grade C25
385m³
946,250.00
C.2
Blockwork, 200mm hollow
2,150m²
312,780.00
D.1
Structural steelwork, fabricated
62.5t
1,204,500.00
E.3
Roof covering, profiled sheet
1,480m²
486,320.00